Hankkija

Vastaanotettu Hilmaan2020-08-31
Ilmoituksen numero2020-053030
TED numero2020/S 172-416598
OstajaorganisaatioFingrid Oyj (1072894-3 )
Läkkisepäntie 21
FI-00620 Helsinki
http://www.fingrid.fi
Hankinnan otsikkotiedot400 kV 400 MVA Power Transformers 2022-2025
Hankinnan yhteenlaskettu kokonaisarvo koko ajalle (ilman alv:ta) arvio
Hankinnan yhteenlaskettu kokonaisarvo koko ajalle (ilman alv:ta) lopullinen
Alkuperäinen ilmoitushttps://www.hankintailmoitukset.fi/en/public/procurement/40197/notice/53030/overview
Originaali JSON tietue53030.json

Ostettava

Hankinnan lyhyt kuvausGENERAL Fingrid Oyj, the Finnish national transmission system operator, is initiating this procurement process for 410/120/21 kV 400/400/125 MVA system transformers with the intended delivery between years 2022-2025 for existing and new substations in various locations in Finland. With this invitation to participate Fingrid is looking for capable and interested candidates to provide the needed power transformers. In our operating model, the network of services and good suppliers as well as good co-operation between different contractual partners are especially important. We require all our contractual partners to be aware of Fingrid’s significant duties as responsible transmission system operator in Finland and to commit to responsibility of the economic, social and environmental impact of their operations. The delivery of power transformers, including all needed transportation and erections, will be performed as turnkey deliveries. The transformer deliveries will be separate from the substation construction projects performed by other contractors, however, there is a need to coordinate the delivery of power transformers with the construction work at site. DELIVERY Delivery of 410/120/21kV, 400/400/125 MVA power transformers including: - Manufacturing of transformers with fittings and accessories - Testing, - Sea transportation to Finland, - Loading on the railway truck in the port, reloading on the road truck and transport to the site. The Supplier may choose the means and route of transportation. - Unloading on the foundation, erection, testing and commissioning at site. - All organizational work needed for logistics: arrangement of transportation from factory to site, customs clearance and forwarding Preliminary 410/120/21, 400/400/125 MVA transformer specification is attached to this prequalification (see attachment PRELIMINARY S22341E1 Transformer 400 MVA). Delivery locations are preliminary and may be altered during procurement process. Detailed schedules shall be given at a later stage of the procedure. See attachment "Delivery locations". PRELIMINARY SCHEDULE OF THE PROCUREMENT Fingrid will use the negotiated procedure for this procurement of power transformers. The negotiated procedure will tentatively go as follows. Fingrid, however, reserve all rights to revise and edit the schedule during the process. INVITATION TO PARTICIPATE This Invitation to Participate has been launched Application to Participate: Deadline to provide Application see IV.2.2. APPLICATIONS AND THEIR EVALUATION All candidates, who have submitted the application within the set deadline and who meet the minimum requirements set for the candidate’s eligibility will be selected to the negotiated procedure. PRELIMINARY CALL FOR TENDER Fingrid plan to launch the preliminary call for tender during week 41. The preliminary call for tender is contemplated to include some alternative scheduled dates for negotiations. Candidates will be given approximately 2 weeks to provide the preliminary tender. NEGOTIATIONS Negotiations with all selected candidates will take place tentatively during weeks 45-46. Invitations to negotiations will be send out after first evaluation of preliminary tenders and possible draft agendas will be given to candidates in advance. Negotiations will most probably, due to the ongoing COVID-19 situation, be held through teams-application or similar conference call program. FINAL CALL FOR TENDER When the negotiations phase has ended, Fingrid will launch the final call for tender. The aim and target is to launch the final call during week 47-48. EVALUATION OF FINAL TENDERS AND CONTRACT AWARD Fingrid aim to finalize the procurement process during January 2021.
Hankintanimikkeistö (CPV) pääElectrical machinery, apparatus, equipment and consumables; lighting (31000000)
Hankintanimikkeistö (CPV) muut
AluekoodiFI
Pääasiallinen suorituspaikkaMain Delivery: Substation in Pysäysperä. Optional Delivery: to be confirmed.