This is early beta for now! Can't handle all templates properly
Hankkija
Vastaanotettu Hilmaan | 2022-10-26 |
Ilmoituksen numero | 2022-111570 |
TED numero | 2022/S 210-605042 |
Ostajaorganisaatio | Helen Ltd (2630573-4 ) Kampinkuja 2 FI-00100 Helsinki http://www.helen.fi/index.html |
Hankinnan otsikkotiedot | Helen Ltd's procurement of industrial electrode hot water boilers |
Hankinnan yhteenlaskettu kokonaisarvo koko ajalle (ilman alv:ta) arvio | |
Hankinnan yhteenlaskettu kokonaisarvo koko ajalle (ilman alv:ta) lopullinen | |
Alkuperäinen ilmoitus | https://www.hankintailmoitukset.fi/en/public/procurement/77281/notice/111570/overview |
Originaali JSON tietue | 111570.json |
Ostettava
Hankinnan lyhyt kuvaus | Helen Ltd is planning to increase carbon neutral DH production with 3 x 50 MW electrode boilers units installed to Hanasaari production site in the existing boiler building. The delivery includes complete electrode hot water boiler units designed, manufactured, delivered, installed and commissioned to Hanasaari, Helsinki. The preliminary scope of supply is described in the initial RFT and in its Annexes. The commissioning of the electric boiler unit will take place after all of the process pipeline, electricity and automation installations are ready, according to the present schedule in 09/2024. The electric boiler units are planned to be in commercial operation by 10/2024. The schedule is preliminary and subject to change. |
Hankintanimikkeistö (CPV) pää | |
Hankintanimikkeistö (CPV) muut | Boiler installations (42160000) |
Aluekoodi | FI1B |
Pääasiallinen suorituspaikka | Hanasaari, Helsinki |
Sopimukset
Ostettava
Hankinnan lyhyt kuvaus | Helen Ltd is planning to increase carbon neutral DH production with 2 x 50 MW electrode boilers units installed to Salmisaari production site in a new production facility. The delivery includes complete electrode hot water boiler units designed, manufactured, delivered, installed and commissioned to Salmisaari, Helsinki. The preliminary scope of supply is described in the initial RFT and in its Annexes. Newly built production facility will also be including other production unit and its installation and commissioning will be completed parallel to electrode boiler units. Working on a joint construction site requires good cooperation with another suppliers. The supplier must be able to start installing the equipment in the new production facility during the time of a construction finishing. The commissioning of the electric boiler unit will take place after all the process pipeline, electricity and automation installations are ready, according to the present schedule in 09/2024. The electric boiler units are planned to be in commercial operation by 10/2024. The schedule is preliminary and subject to change. |
Hankintanimikkeistö (CPV) pää | |
Hankintanimikkeistö (CPV) muut | Boiler installations (42160000) |
Aluekoodi | FI1B |
Pääasiallinen suorituspaikka | Salmisaari, Helsinki, Finland |
Sopimukset
Ostettava
Hankinnan lyhyt kuvaus | Helen Ltd is planning to increase carbon neutral DH production with 30 MW electrode boiler unit installed to Eiranranta heat pump plant. The delivery includes complete electrode hot water boiler unit designed, manufactured, delivered, installed and commissioned to Eiranranta, Helsinki. The preliminary scope of supply is described in the initial RFT and in its Annexes. The boiler unit and auxiliary systems must be erected in an extend that it can be connected to the Client's process pipelines, according to the present schedule in 10/2024. The electric boiler unit are planned to be in commercial operation by 7/2025. The schedule is preliminary and subject to change. Part A3 shall be considered as an option, but can be quoted singly. |
Hankintanimikkeistö (CPV) pää | |
Hankintanimikkeistö (CPV) muut | Boiler installations (42160000) |
Aluekoodi | FI1B |
Pääasiallinen suorituspaikka | Eiranranta, Helsinki, Finland |